Railway Embankment Improvement Technique

Published on . Written by

Railway Embankment Improvement Technique
In this era, development of infrastructure such as roadway, bridges, various buildings etc. are increasing exponentially. Due to insufficient quantity of useful land and strength of soil, engineers improve the soil properties like bulk density, strength etc. by adopting different techniques. In areas of loose deposits, ground improvement is required to check the required performance.

Read more..
Railways are one of the oldest means of transportation and had been in use till date. Axle loads, Speed & Traffic density during that time was lower compared to now in use, so it is necessary to focus on improving it. Addition of increased factor, they have to cross over existing soft deposits of soil as a part of the existing alignment system.

Project Description:


    Skyfi Labs Projects
    In order to achieve high efficiency of the rail system, post-construction settlement of the subsoil must be checked and attention should be given on that and the most important point to keep in mind is the factor of safety of the structure against slip failure.

    One of the methods of ground improvement technique is to reinforce the soil with steel, fibers, fiberglass, geotextiles etc. A various mechanical method such as Vibro compaction, vibro replacement, ground freezing, grouted stone columns, dry soil mixing. Among all Geocell technique is recently developed.

    Geocell: It is like a confinement box and are in shape of the honeycomb and made with high-density polyethylene strips and are expanded on site. It has wide scope in the improvement of soil parameters like controlling the erosion of soil in steel slope construction, improving stability to the base of railway tracks that prevent failure of ballast.

Project Implementation:

    The implementation of this project starts with following simple steps:

  1. Collect disturbed soil sample from site.
  2. Determine the soil properties like liquid limit, OMC, MDD etc.
  3. Prepare the specimen for different tests with the soil only, in three to four layers according to test requirement.
  4. Add geocell in sample at varying depth to find effective depth.
  5. Perform various test on sample to find different soil properties like CBR (California bearing ratio), plate load.
  6. Compare different soil properties such as bearing capacity, shear strength, strength and cost of all results for soil with and without geocell.